Setting out
Where the design meets the ground on both sides of every section (toe of the bank, top of the cutting), with offset and level and, with the horizontal alignment, easting and northing – for the slope stakes in the field.
Commands
CXSETOUTSetting-out (slope stakes)…
Slope stake report: where the design meets the ground on both sides of each section (toe of fill / top of cut) with offset, level and – from the horizontal alignment – easting and northing, the cut or fill at the centre and every design point.